Quality & cases

Documents to check, examples to compare

We publish a document only when the current file is on hand. Where a certificate is still being prepared, the page says so instead of showing a placeholder seal. The cases below describe how a process was chosen — they are application examples, not customer endorsements.

Documentation

What can be checked before you order

Certificate document
pending

Quality management system

Process control for incoming components, assembly and final electrical test on resistance welding power sources and special machines.

Certificate document pending

Certificate document
pending

Product conformity file

Electrical safety and EMC documentation prepared per machine model for the destination market.

Certificate document pending

Certificate document
pending

Export documentation

Packing list, commercial invoice and shipping records issued per shipment.

Issued per order

Ask the export desk for the current document set before a tender submission. Documents are issued per destination market where the file exists.

Application examples

Workpieces, machines and the reason for the choice

Automotive brackets being spot welded on a production lineApplication example

Automotive parts

Seat brackets, 1.2–2.0 mm galvanised steel

SY-MFDC 100 spot welder

Closed-loop current control held nugget size inside the peel-check window as electrode tips wore through the shift, so the schedule did not need re-tuning mid-run.

Stainless appliance panel with welded nuts in a fixtureApplication example

Home appliances

Housing side panel with welded M8 nuts

SY-PRO 160 with SY-NF 8 feeder

Nut placement and projection welding run as one interlocked cycle, removing a manual loading step and keeping nut position repeatable.

Plate radiator panels prepared for seam weldingApplication example

Radiators

Plate radiator panel, 0.8 mm steel

SDM-60 seam welder

Constant roller travel speed and programmed pressure produced a continuous seam along the panel length, with pressure set to limit marking on the visible face.

How we work

From requirement to shipment

Tests are run at the four checkpoints below on every machine before packing. The order sequence is the same for a single unit and for a mixed container.

  • 01Incoming material
  • 02Assembly
  • 03Electrical test
  • 04Packing and dispatch

01

Requirement

Share the material, sheet thickness, weld points per part and cycle time. Drawings or photos are welcome.

02

Configuration

We propose a machine, gun and spares set, with the parameters that change if your material does.

03

Verification

Sample welding or a video demonstration on your material before the order is confirmed.

04

Order and shipment

Packing list, commercial invoice and shipping records are issued per order.

Next step

Request the document set or a sample weld

Tell us the market you are supplying and the process you run, and the reply will match that context.

Contact the export desk